Prep Standard

This checklist is part of every proposal. The crew lead signs it off per room or elevation before finish paint is applied.

Interior

  1. Furniture moved to room center and covered; floors papered or drop-clothed; outlets, fixtures and hardware masked or removed.
  2. Walls and trim washed where needed (kitchens, baths, smoker's homes).
  3. Nail holes, dings and cracks filled; larger damage patched with mesh and setting compound; textured to match.
  4. Glossy surfaces de-glossed and scuff-sanded; all patches sanded flush.
  5. Patches, stains and bare wood spot-primed with the right primer (stain-blocking where needed).
  6. Gaps at trim, casings and crown caulked with paintable acrylic.
  7. Dust removed from all surfaces before finish coats.
  8. Two finish coats, cut lines by brush, rolled walls with consistent nap.

Exterior

  1. Low-pressure wash with mildewcide; 2–3 dry days or moisture meter below 15% before paint.
  2. Failing paint scraped to a sound edge; edges feather-sanded.
  3. Bare wood primed within 48 hours; cedar and redwood with stain-blocking primer; rusted nail heads set and primed.
  4. Failed caulk removed; joints, trim and penetrations caulked with elastomeric sealant.
  5. Minor wood repair up to the proposal allowance; rot beyond that reported with photos and a price before proceeding.
  6. Windows, roofing, decks, concrete and plants masked or covered.
  7. Body sprayed and back-rolled; trim, doors and railings brushed. Two coats where the package says two.
  8. Daily inspection by the crew lead with photos.

Pre-1978 homes

Lead-safe practices apply when testing finds lead: containment, wet methods, HEPA-shrouded tools, no high-heat removal, HEPA cleanup and a written record. See lead-safe painting.

Ready for a price you can plan around?

Get a ballpark in a minute, or book a free on-site or video estimate and receive a fixed-price proposal within 24–48 hours.