Skip to content
West House Painting

Exterior Painting in Longview & Vancouver, WA

Exterior paint in Southwest Washington has to survive nine months of rain and a few weeks of hard sun. The paint matters, but preparation decides whether the job lasts four years or twelve.

Every exterior gets a wash, scrape, sand, prime and caulk sequence that is written into the proposal, two finish coats of a premium acrylic, and a five-year written warranty.

Packages

Three ways to do it right

Essential

$5,200

  • Wash, scrape, sand failing areas
  • Spot-prime bare wood
  • Two coats on body, one on trim
  • 5-year warranty
Price this package
Most chosen

Signature

$6,000

  • Everything in Essential
  • Full caulk of joints and trim
  • Two coats on body and trim
  • Sherwin-Williams Duration or Emerald
Price this package

Heirloom

$7,000

  • Everything in Signature
  • Full prime of all siding
  • Minor wood repair up to 20 linear ft
  • Doors brushed in enamel
Price this package

Scope

What is included

Included in every job

  • Pressure wash and mildew treatment
  • Scraping and sanding of failing paint
  • Spot-prime bare wood and rusted nails
  • Caulking of open joints and trim
  • Masking of windows, roof lines, landscaping
  • Two coats on siding, trim per package
  • Daily cleanup and final walkthrough

Not included

  • Dry rot and structural repairs beyond 20 linear ft
  • Gutter replacement
  • Lead abatement (lead-safe practices are included for pre-1978 homes)
  • Painting roofs

Our prep standard lists exactly what happens before paint goes on.

Process

How we handle exterior painting

  1. 01

    Estimate

    We measure the house, check moisture in suspect areas and note any wood repair.

  2. 02

    Wash

    Low-pressure wash with a mildew treatment. Two to three dry days before paint.

  3. 03

    Prep

    Scrape, sand, prime bare wood, replace failed caulk, set nails.

  4. 04

    Mask

    Windows, roofing, decks and plants covered. Nothing gets overspray.

  5. 05

    Paint

    Spray-and-back-roll body coats, brushed trim. Two coats, checked at the end of each day.

  6. 06

    Walkthrough

    Walk the house with the crew lead, sign off, receive the warranty.

Fiber cement, cedar lap, cedar shingle and T1-11 each fail in different ways. Cedar bleeds tannins through light colors without a stain-blocking primer. T1-11 soaks up paint at the grooves. Fiber cement is easy but needs its factory primer intact. The price calculator applies a siding factor, and the estimate visit confirms it.

Homes built before 1978 may have lead paint under the current coats. We test, and when lead is present we follow EPA RRP rules: containment, no dry sanding or open-flame removal, HEPA vacuuming and documented cleanup. It is included in the pre-1978 price factor.

Weather is the one thing we cannot schedule. We tell you the same day if rain moves a start date, and we do not paint over damp wood to stay on schedule. The warranty depends on that.

Projects

Exterior Painting projects

Case studies for this service appear here as they are completed. Browse all projects.

Exterior Painting questions

When is the exterior painting season?

Typically April through October. Modern paints can go on down to 35°F, so we stretch the season when surfaces are dry. Your proposal shows the planned week.

How often should I repaint?

Good prep and a premium paint lasts 8–12 years on fiber cement and 6–10 on cedar. Sun-facing sides go first; we can do a south-and-west refresh instead of a full repaint.

Do you spray or brush?

Both. Siding is sprayed and back-rolled so paint is worked into the surface. Trim, doors and railings are brushed.

What about moss and mildew?

The wash includes a mildewcide. Persistent shaded walls get a mildew-resistant topcoat.

Can you paint vinyl siding?

Yes, with vinyl-safe colors that do not warp the siding. Darker colors need a specific formula; we check before we quote.

Ready for a price you can plan around?

Get a ballpark in a minute, or book a free on-site or video estimate and receive a fixed-price proposal within 24–48 hours.